Tarleton Ranch Eco-Village (TREV)
Tarleton Ranch Eco-Village has been thoughtfully master planned as a planned unit development (PUD), to be developed in four phases. Three of the four phases (I, II & IV) also include sub phase opportunities that can provide for up to eight separate development phase releases. The development order of phase numbering may be different than the order of actual phase releases. And each phase may include development of some TREV infrastructure located in other phases.
TREV Master Plan
Tarleton Ranch Eco-Village has been a development process spanning many years and focused more recently in the past 5 years in its current submittal to Taos County. There have been countless meeting with neighbors, county officials, consultants along with changes and iterations of the planning, design and development process with the core team.
So what is a Master Plan and what is included?
A master plan is a detailed set of design drawings that include the major site plan that shows the streets, lots for homes and the following:
PROJECT INTRODUCTION
PROJECT LOCATION MAPS, CONSULTANTS
PUD SITE & PHASING MAP
PUD MASTER DEVELOPMENT PLAN & STATISTICS
TAOS COUNTY LUR ZONING & ZONING W/PUD OVERLAY
PUD ZONING ANALYSIS
ECO-FARM AREA PLAN
ECO-VILLAGE SITE PLAN
• SITE SECTIONS W/DEVT STATISTICS
• CIRCULATION & PARKING PLAN
• AFFORDABLE HOUSING PLAN
PROJECT RENDERINGS
TREV SMART CODE
• ARCHITECTURE STYLES (PUEBLO, TERRITORIAL,
BARN VERNACULAR & CREATIVE INTERPRETATIONS)
• SMART CODE STREET SECTIONS
• VILLAGE CENTER STREET SECTIONS
• FLOOR PLAN EXAMPLES
• ELEVATION EXAMPLES
TREV PERMACULTURE ECO-FARM PLAN
• SITE, CLIMATE & SECTOR ANALYSIS
• PERMACULTURE ZONE ANALYSIS
• SECTIONS & DETAILS
ACEQUIA MAP
FLOOD PLAIN MAP
WETLAND AREA MAP
SLOPE ANALYSIS MAP
PRELIMINARY PUD SKETCH PLAT INFO.
PRELIMINARY PUD SKETCH PLAT A
PRELIMINARY PUD SKETCH PLAT B
UTILITY AND FIRE PROTECTION (FULL PLAN)
GRADING, DRAINAGE & TERRAIN MAN. (FULL PLAN)
TREV PHASE I (PI) DEVELOPMENT PLANS
• PI NOTES & INDEX
• PI PROPERTY SURVEY PLAT
• PI GRADING, DRAINAGE & TERRAIN MANAGEMENT
• PI UTILITIES & FIRE PROTECTION
• PI SECTIONS
• PI DETAILS
• PI OFF-SITE WATER SERVICE
TREV PHASE II (PII) DEVELOPMENT PLANS
• PII NOTES
• PII PROPERTY SURVEY PLAT
• PII GRADING, DRAINAGE & TERRAIN MANAGEMENT
• PII UTILITIES & FIRE PROTECTION
• PII SECTIONS
• PII DETAILS
• PII WATER TANKS
TREV PHASE III (PIII) DEVELOPMENT PLANS
• PIII NOTES
• PIII PROPERTY SURVEY PLAT
• PIII GRADING, DRAINAGE & TERRAIN MANAGEMENT
• PIII UTILITIES & FIRE PROTECTION
• PIII SECTIONS
• PIII DETAILS
• PIII WASTE WATER TREATMENT PLANT (WWTP)
• PIII TREATED EFFLUENT SYSTEM PLAN & SECTIONS
TREV PHASE IV (PIV) DEVELOPMENT PLANS
• PIV NOTES & INDEX
• PIV PROPERTY SURVEY PLAT
• PIV GRADING, DRAINAGE & TERRAIN MANAGEMENT
• PIV UTILITIES & FIRE PROTECTION
• PIV SECTIONS
• PIV DETAILS
• PIV WASTE WATER LIFT STATION